Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

Filton Abbey

Sector:       Education
Client:         Filton Abbey Primary School
Filton Avenue Primary school approached RPA to deliver: A replacement dining facility; additional classroom and group rooms; a new reception and community space; new multi use sports pitches; and new childrens external play areas. RPA were appointed as Quantity Surveyor & Principal Designer.

The scheme

RPA prepared feasibility cost estimates for each of the various options, assisting the client with developing their overall project budget. This informed the Schools decision on which option to progress, and provided the document required for DfE funding application.

 

The Costed Feasibility Masterplan Report, BB103 Analysis and Condition Survey were all instrumental in the successful application for capital funding from the DfE through a CIF bid. Following the successful completion of the RIBA Stage 0-1 masterplan exercise, RPA provided a full delivery service to the School from RIBA Stage 2 to 7.

 

This included a planning application, competitive tender and administration of the building contract (JCT Intermediate). Since the completion of the feasibility masterplan, £1.2m of building work has been successfully delivered on budget.

The school site is in an urban location and enclosed on three sides by residential areas. The school site is densely packed in with available external space allocated for play areas and sports pitches.

 

As such there were very few locations where new accommodation could be added. By rebuilding the dining hall on the site of its predecessor, we were able to avoid encroaching onto the playground or sports pitches, avoiding any planning conflicts with Sports England. For the Dining Hall element of the works, the first round of funding applications was unsuccessful, which was later overturned in an appeal 12 months later.

 

RPA worked very closely with the School during this process. Given the expiry date of the first tender [which for funding reasons the School could not accept], the project team re-tendered the scheme a year later and we still managed to deliver a contract for a similar value, albeit with a different contractor.

 

The new dining hall was designed to with a high-performance external envelope.

 

The form developed at master planning stage allowed it to be naturally lit and naturally ventilated, leading to very low energy usage. New buildings were positioned to limit loss of green space, and avoid loss of existing site trees.